On-site installation

Zeus Control installs the components of control systems in industrial production plants.

On-site installation activities are:

Installation of cable trays.

Installation of cable trays.

  • Installation of operation and supervision equipment.
  • Installation of electrical and control cabinets.
  • Installation of instruments.
  • Installation of cable trays and conduits for control cables.
  • Cable laying between¬†control cabinets,¬†sensors and actuators.
  • Installation of cable trays and conduits for power¬†cables.
  • Cable laying between¬†MCC and consumers.
  • Marking and connection of cables.

Tests are conducted to verify the electrical installation. The most significant tests are as follow:

  • Continuity:¬†Ensuring¬†each wire has both ends where they are¬†supposed to be.
  • Isolation resistance: Checking¬†the isolation resistance of every conductor to earth is high enough.
  • Safe continuity: ¬†Verifying installation of safety wires.

All equipment is installed following the previously approved engineering documentation. These documents are of the utmost importance to ensure success.

Installation of an actuator.

Installation of an actuator.

Necessary documentation includes:

  • Drawings of¬†installation of operation and supervision equipment.
  • Drawings of installation of control cabinets.
  • Drawings of installation of power distribution cabinets.
  • Drawings of¬†typical installation of instruments.
  • Drawings of connections of control equipment.
  • Drawings of¬†connections of instruments and actuators.
  • Power cable list.
  • Drawings of routing and dimensions of¬†control cable trays.
  • Drawings of routing and dimensions of¬†power cable trays.
  • Drawings of connection terminals in control cabinets.
  • Drawings for routing of control cables.
  • Drawings for routing of power cables.