Projects

Complete automation projects are the core business of Zeus Control.

Portable control room for the dismantling of the José Cabrera nuclear power plant.

Portable control room for the dismantling of the José Cabrera nuclear power plant.

Zeus Control is prepared to carry out high quality complete automation projects.

If a project cannot be fully implemented by Zeus Control two options are proposed:

  1. Zeus Control carries out a part of the whole project.
  2. Zeus Control carries out the whole project subcontracting other companies.

 

Zeus Control has never subcontracted more than 15% of the whole project.

An automation project is divided into the following parts:

  • Feasibility study.
  • Basic engineering and detail engineering.

    Installing services in the José Cabrera nuclear power plant.

    Installing services in the José Cabrera nuclear power plant.

  • Purchasing of electrical and control equipment.
  • Programming of electrical and control equipment.
  • Construction of electrical and control cabinets.
  • Tests in Zeus Control workshop.
  • Electrical installation in industrial plant.
  • Tests before start-up.
  • Commissioning services.
  • Maintenance services.

A complete automation project includes from the feasibility study to the maintenance.