
Project Info
Description
Casty ice cream production plant
Client: Casty. Period: 2013-2014.
Project description: new ice cream production plant in Talavera La Nueva (Toledo). Process includes ingredient stock, dosage and mixing, using traceable technology.
Zeus Control scope: control architecture design, supply of completely programmed control system, FAT tests at Zeus Control workshop, SAT tests and commissioning.
Economic valuation: 180.000 €
Technological resources: control system is based on Siemens S7-317 controller with communications using Profinet and Profibus networks. Process operation and supervision is carried out through SCADA WinCC and WinCC Flexible